The "Environmental Impact Report on the Comprehensive Utilization of High-Purity New Material Resources for Electronic Products by Shandong Feiyuan Technology Co., Ltd." (Draft for Comments) has been completed. In accordance with the spirit of the "Environmental Impact Assessment Law of the People's Republic of China" and the "Measures for Public Participation in Environmental Impact Assessment," the environmental impact assessment of this project is now being publicized to widely understand the attitudes of the public from all sectors of society towards the project construction and their opinions and suggestions on environmental protection, and to accept public supervision.
1. Project Summary
Project Name: Environmental Impact Report on the Comprehensive Utilization of High-Purity New Material Resources for Electronic Products by Shandong Feiyuan Technology Co., Ltd.
Construction Location: Gaoging Chemical Industrial Park, Zibo City, Shandong Feiyuan Technology Co., Ltd. factory area
Main Construction Content: Mainly includes the construction of an ammonium bifluoride recovery unit with a capacity of 800t/a, a nickel recovery unit with a capacity of 400t/a, a liquid nitrogen recovery unit with a capacity of 40t/d, raw material and finished product storage area, circulating water system, air compression system, and other public auxiliary facilities, all relying on existing projects.
2. Network Link to the Full Text of the Draft Environmental Impact Report and Methods to Access the Paper Version
The network link to the full text of the draft environmental impact report for this project is:
d3af45156e6f79f2875d0d8d5f49cb2b.rar, and the paper version of the report can be accessed at Shandong Feiyuan Technology Co., Ltd.
3. Scope of Public Consultation
The scope of public consultation for this project includes residents and units within a 5km radius around the Shandong Feiyuan Technology Co., Ltd. factory area.
4. Network Link to the Public Opinion Form
If the public has any opinions on the construction of this project, they can download the "Public Opinion Form" via the network link and fill it out. The network link is:
deae99a805864e910b13fe2bb6a0ccd7.docx
5. Methods and Channels for the Public to Submit Opinions
If the public has any opinions on this project, they can fill out the "Public Opinion Form" as required. The public can submit the completed public opinion form and other relevant materials to the construction unit within the specified time through letters, faxes, emails, or other methods provided by the construction unit, reflecting opinions and suggestions related to the environmental impact of the construction project.
Construction Unit Contact: Manager Bi, Contact Number: 13853316161; Email: 1946370494@qq.com
Construction Unit Address: Gaoging Chemical Industrial Park, Zibo City
Environmental Assessment Unit Contact: Engineer Zhang, Phone: 0531-81795815 ext. 8015; Email: jn1608@126.com
Environmental Assessment Unit: Shandong Haimeng Project Consulting Co., Ltd.
6. Timeframe for Public Submission of Opinions
The public can submit valuable opinions to the environmental assessment agency and the construction unit within 5 working days from the date of this announcement (2019.5.29~2019.6.4).
Shandong Feiyuan Technology Co., Ltd.
May 29, 2019