Emergency Response Plan Drill for Hazardous Chemical Safety Accidents at Feiyuan Chemical
Release time:2015-10-23 09:37:09
  |  
Reading volume:2
Word Size:
A+ A- A

"Safety responsibility is heavier than Mount Tai." After the Tianjin explosion incident, Zibo Feiyuan Chemical Co., Ltd. learned lessons, summarized experiences, identified shortcomings, and actively responded. While maintaining the stable operation of the company's safety system, fully implementing various safety management systems, and strictly executing safety training and drill plans, the company actively responded to the requirements of safety supervision departments at all levels, increased investment in safety work, and strengthened safety efforts.

Recently, in order to effectively implement the "Emergency Rescue Plan for Production Safety Accidents of Zibo Feiyuan Chemical Co., Ltd." and respond to sudden major safety accidents, timely and effectively implement emergency rescue, and effectively protect the lives and property of the company and its employees, Zibo Feiyuan Chemical Co., Ltd. successfully conducted the 2015 annual production safety accident emergency rescue drill in the R32 production plant area under the care of leaders at all levels and the active participation and close cooperation of various departments.

 

I. Drill Scenario Design

 

1. Time: 9:30 AM, August 28, 2015.

 

2. Location: R32 plant area, West Plant of Zibo Feiyuan Chemical Co., Ltd.

 

3. Accident Overview: Around 9:45 AM on August 28, 2015, a valve leak was discovered in the riser pipeline of reactor D in the R32 production plant area by on-site employee Xu Da. Acidic gas (simulated by steam, with the sound of an alarm buzzer) began to leak from the leak point. One on-site inspector, Fan Yongmeng, was trapped on the fourth floor of the plant building and requested rescue. Others were in the control room under the leadership of the shift leader. Personnel from other workshops in the plant were working as usual. There were also people working in the living area.

 

4. Weather Conditions: Southeast wind, 2-3 levels, clear weather.

 

5. Drill Command Post Location: East side of the fountain in front of the office building.

 

II. Participants of the Drill and the Purpose, Significance, and Precautions of the Drill

 

Drill Command Post Members

 

Commander-in-Chief: General Manager Zhang Leyong

 

Deputy Commander-in-Chief: Chief Engineer Su Peishan

 

On-site Commander: R32 Product Department Manager Zhang Chaocan

 

Emergency Rescue Team (including rescue, emergency response, decontamination, and detection): Sun Donglin, Qi Sifeng

 

Evacuation and Security Team: Wang Shengli, Geng Lijuan, Wang Qiang, Li Jinxue

 

Medical Rescue Team: Zhang Chengmei, Duan Feifei

 

Communication and Liaison Team: Tian Maoguang, Yi Tao, Zhu Kaikai, Zhu Ruirui, Yang Kai

 

Material Supply Team: Gong Runxian

 

Note: The first person in each team list is the team leader.

 

9:30 AM Leaders from Gaoging County and Gaocheng Town government departments, drill command post members, and participants gathered at the command post.

 

9:35 AM The Commander-in-Chief emphasized the purpose, significance, and requirements of the drill.

 

(1) Test the emergency response and rescue initiation procedures in the event of an accident;

 

(2) Verify whether the company's emergency organization and member responsibilities are clear;

 

(3) Test the emergency response and practical capabilities of the employee team in the event of an accident;

 

(4) Test the technical status and emergency response capabilities of emergency teams, firefighting equipment, supplies, and technical equipment in the event of an emergency;

 

(5) Test the familiarity of relevant personnel with the emergency rescue plan.

 

9:45 AM The Commander-in-Chief announced: The 2015 annual emergency rescue drill of Zibo Feiyuan Chemical Co., Ltd. begins! All participants returned to their work positions.

 

After the drill, company leaders summarized the drill and put forward new requirements: 1. Require shift leaders of each product department to handle problems independently, ensuring each shift can handle emergencies, cultivating emergency response speed and problem-solving efficiency. General Manager Xing emphasized that the survival of employees is paramount, and all drills should be practical, combining theory with practice; 2. Transform "government-led safety" into "employees ensuring their own safety," ensuring that every employee knows and can implement problem-solving measures and methods; 3. Further refine and improve the pressurization of firefighting water.

Leaders from Gaoging County and Gaocheng Town government departments, drill command post members

Participants gathered at the command post

Valve leak in the riser pipeline of reactor D in the R32 production plant area

Emergency rescue team